This application was deferred from the meeting of the
Planning Committee on 25th September 2019 in order to
obtain further advice from an independent Highways
Consultant.
Further details relating to the application were
included in the Supplementary Report, including an amended
recommendation reflecting an additional financial contribution
officer by the applicant towards highways improvements in the local
area.
The Planning Manager (Development Control) presented
the report which gave details of the application and highlighted
the location and features of the site and key issues.
The agent on behalf of the applicant attended the
meeting and spoke in support of the application.
Committee considered the
application having regard to the Bolsover District Local Plan, the
emerging Local Plan and the National Planning Policy
Framework.
The
only matters for consideration in this application were whether the
revised drainage system with underground tank was acceptable and
technically feasible, taking into account sustainable drainage
principles, and whether the revised access was safe and suitable
for the proposed development.
On
the basis of the independent advice from the highways consultant,
it was considered that the T-Junction proposed in the application
would provide a safe and suitable access to both the housing site
and the commercial site subject to the detailed design
considerations that would be considered at the s.278 stage of the
development.
It
was also noted that the applicant offered to safeguard land for the
provision of a suitable roundabout to provide for a left-turn
solution out of Tally End and a sum of £150,000 was offered
to be put towards a suitable roundabout at this location.
Alternatively this money could be used towards other highways
improvements within the local area.
Moved by Councillor Steve Fritchley and seconded by Councillor
Janet Tait
RESOLVED that
application 19/00256/VAR be
approved subject to:
- prior
entry into a legal agreement to secure land for the provision of a
roundabout and a combined financial contribution of no less than
£150,000 towards highway improvements within the local
area;
- the
following varied conditions:
- The
underground tank for the proposed sustainable drainage system for
the housing development shall be located in accordance with the
details shown on drawing No.
E17/7044/004V (Revision V) produced by Haigh Huddleston and
Associates.
- Prior to
the occupation of any dwelling hereby permitted, a fully
operational surface water drainage system shall have been completed
on site in accordance with detailed plans and specifications first
submitted to and agreed in writing by the local planning
authority.
- Before any
dwelling or other commercial building is first occupied, the new
access junctions shall be formed onto the A619, Chesterfield Road
generally in accordance with application drawing number
LTP/3383/S1/01.01 Rev 0 produced by
Local Transport Projects.
AND
- the
following conditions repeated from the original permission
(application no. 17/00298/VAR)
Safeguarded Trees and Hedgerows
- The
existing hedgerows and trees identified as to be safeguarded on the
Design Concept and Illustrative masterplan drawings as contained
within the Design and Access Statement and its addendum by
FPCR LLP submitted with the application
documents, shall be retained, and protected during construction
works.
Ground Conditions
- The
proposed development shall be carried out in complete accordance
with the implementation and mitigation measures contained within
the gas risk assessment approved under discharge of conditions
application no. 15/00406/DISCON.
- A detailed
remediation scheme to bring the whole site to a condition suitable
for the intended uses by removing unacceptable risks to human
health, buildings and other property, and the natural environment
must be prepared, and is subject to the approval in writing of the
Local Planning Authority. The scheme
must include all works to be undertaken, proposed remediation
objectives and remediation criteria, timetable of works and site
management procedures. The scheme must
ensure that the site will not qualify as contaminated land under
Part 2A of the Environmental Protection Act 1990 in relation to the
intended use of the land after remediation.
- The
remediation scheme approved in accordance with condition 3 above,
must be carried out in accordance with its terms, unless otherwise
agreed in writing by the Local Planning Authority. The Local Planning Authority must be given two
weeks written notification of commencement of the remediation
scheme works.
- Following
completion of measures identified in the remediation scheme
approved in accordance with condition 3 above, a verification
report (referred to in PPS23 as a validation report) that
demonstrates the effectiveness of the remediation carried out must
be produced, and is subject to the approval in writing of the Local
Planning Authority. The verification
report will also provide for any long term monitoring of pollutant
linkages, maintenance and arrangements for contingency action as
approved in writing by the Local Planning Authority.
- In the
event that contamination is found at any time when carrying out the
approved development that was not previously identified it must be
reported in writing immediately to the Local Planning
Authority. An investigation and risk
assessment must be undertaken, and where remediation is necessary a
remediation scheme must be prepared, which is subject to the
approval in writing of the Local Planning Authority. Following completion of measures identified in the
approved remediation scheme a verification report must be prepared,
which is subject to the approval in writing of the Local Planning
Authority.
- In the
event that it is proposed to import soil onto site in connection
with the development, the proposed soil shall be sampled at source
and analysed in a laboratory that is accredited under the
MCERTS Chemical testing of Soil Scheme
for all parameters requested (where this is available), the results
of which shall be submitted to the Local Planning Authority for
approval. Only the soil approved in
writing by the LPA shall be used on site.
- Piling or
any other foundation designs using penetrative methods shall not be
permitted unless it has been demonstrated to the Local Planning
Authority and agreed in writing,
that there is no resultant unacceptable risk to
groundwater.
Highways
- The
development hereby approved shall take place in accordance with the
agreed Framework Travel Plan for the site dated December 2008 and
with reference D118649.
- No
development within either phase of the development shall be
occupied or otherwise brought into use unless and until footways
have been provided between the bus stop shelters on Chesterfield
Road (north east of the vehicular access into the development) and
the residential and commercial areas of the
development.
Conditions relevant to the Housing
Development
- Prior to
the occupation of a dwelling (or in accordance with a scheme of
implementation submitted to and approved in writing by the local
planning authority) a controlled pedestrian crossing of the A616
dual carriageway to the northern side of the residential site shall
be provided to link the footpath from the north east of the
residential site with the footway to the northern side of the
A616/A619 roundabout in accordance with details previously submitted to and approved in writing by
the local planning authority.
- Prior to
the occupation of a dwelling (or in accordance with a scheme of
implementation submitted to and approved in writing by the local
planning authority) the footpath from the north east of the
residential site shall connect with the footway to the western side
of the A616/A619 roundabout in accordance with details previously
submitted to and approved in writing by the local planning
authority.
- Prior to
the occupation of a dwelling the new streets within the development
shall have been laid out and constructed to at least base course,
lit and drained to provide a link from the dwelling to the existing
public highway.
- Construction work shall not begin on the residential element of
the proposal until a scheme for protecting the proposed residential
development from road traffic background noise (principally from
the M1 motorway) has been submitted to and approved in writing by
the Local Planning Authority. All works
which form part of the approved scheme shall be completed before
any part of the residential development is occupied.
- No
dwellings shall be erected within 20 metres of the application site
boundary with the M1 motorway.
- There
shall be no occupation of dwellings adjacent to 124 Chesterfield
Road whilst ever those premises are used for a scaffold
business.
Conditions relevant to the Commercial
Development
- Prior to
discharges to the public sewer from the commercial phase of the
development all surface water drainage from parking areas and
hardstandings shall be passed through a
petrol/oil interceptor with an overall capacity compatible with the
site being drained.
- Before any
related premises are occupied on the commercial phase of the
development the whole of the vehicle parking and manoeuvring area
and all service areas (including secure/covered cycle parking)
shall be formed, laid out, constructed and surfaced in concrete,
tarmacadam or block pavers. All parking
spaces shall be clearly and permanently delineated and shall be
retained for their intended use at all times.
- The access
road serving the commercial phase of the development shall include
a turning area suitable for large HGV's.
Legal Agreement
- Prior to
the first occupation of any dwelling or commercial unit hereby
permitted, a completed deed of variation that links this permission
to the varied obligations attached to 09/00370/OUTMAJ, or a completed s.106 legal agreement
containing the same obligations, shall be submitted to the Local
Planning Authority.